Installation & Operation

Installation & Operation

How long does installation take?

Installation usually takes 1–3 days, depending on the model and user readiness. For desktop models like the LM-M100D, setup can be completed quickly with basic training.

Yes. We provide online and on-site training, including:

Basic operation

Printing software

Powder handling and safety

Post-processing and maintenance
Training materials and video tutorials are also available.

No. Our software is designed for ease of use, even for beginners. After basic training, most users can complete their first print confidently. Advanced users can access expert-level settings for more control.

You need a clean, ventilated room with:

Stable power supply (220V or 380V)

Protective gas (argon or nitrogen) source

Space for powder handling and filter systems
Humidity should be controlled for optimal powder performance.

Uncertain About Where to start your own solutions?

Please enable JavaScript in your browser to complete this form.